Nous vous avons envoyé un message électronique.

Nous sommes désolés mais nous n'avons pas pu vous envoyer le lien sur votre courriel. Veuillez vérifier votre adresse électronique.

Aide contextuelle

GEO5

Tree
Settings
Produit:
Program:
Langue:

Activation

The program allows for removing (deactivating) soils from individual regions. As an example we consider an embankment analysis. In such a case, it must be accounted for already in the topology regime when creating the overall geometrical model. In the 1st calculation stage, however, it can be deactivated. Similar approach applies also to underground or open excavations (tunnels, sheeting structures). When deactivating a region below the ground water it is necessary to correctly model the region boundary.

Modeling embankment - 1st construction stage

The embankment can be subsequently reactivated in the next construction stage.

Modeling embankment - activity of embankment body

Using GeoClipboard there's a possibility to copy current profile as sorted interfaces and allow to copy profile to another program. Copied interfaces are corrected to follow specifications to 2D profile entered from top to bottom.