Verification

Verification of pile bearing capacity depends on the verification methodology selected in the "Piles" tab:

  • verification according to the factor of safety
  • verification according to the theory of limit states
  • verification according to EN 1997

Actual analyses (e.g. assessment of the pile base resistance) are the same for both options - they differ only by incorporation of design coefficients, combinations and in the way of demonstrating the structure safety. Design coefficients (verification parameters) are specified in the "Piles" tab.

If the verification analysis according to CSN 73 1002 is selected, the verification is carried out exclusively according to the Commentary to CSN 73 10002.