GEO5 Logiciel

Aide contextuelle

Tree
Settings
Program:
Langue:

Project

The frame "Project" is used to input basic project data and to specify overall settings of the analysis run. The frame contains an input form to introduce the basic data about the analyzed task, i.e. project information, project description, date, etc. This information is further used in text and graphical outputs.

In this input mode, the assumed setting can be modified only in the first construction stage. The frame also allows user to switch analysis units (metric / imperial). Project data can be copied within all GEO5 programs using "GeoClipboard".

Frame "Project"

Essayez GEO5 gratuitement.